Source desk

Show your work.

Our facts are designed to be checked. These are the current primary documents and the rules used to interpret them.

Methodology

Five fields before a figure.

  1. 01
    Value

    The number exactly as reported or transparently derived.

  2. 02
    Unit

    GW, MW, turbine units, percentage or time period.

  3. 03
    Milestone

    Operating, connected, mechanically installed, under construction, ready to build or forecast.

  4. 04
    Data period

    The year or cutoff date the observation describes—not merely the report date.

  5. 05
    Source

    The accountable publisher and a direct public link.

Current source register

Primary sources used on this site.

Accessed July 19, 2026. We prefer publishers responsible for the dataset or report.

01
Global Wind Report 2026Global Wind Energy Council

Global capacity, annual additions, country coverage and the 2026–2030 outlook.

Open source ↗
02
Global wind installations rise a record 40%Global Wind Energy Council

2025 installations, regional split and five-year market forecast.

Open source ↗
03
Global Offshore Wind Report 2026 releaseGlobal Wind Energy Council

Offshore operating capacity, construction pipeline and growth outlook.

Open source ↗
04
Wind turbine installations and OEM market updateGlobal Wind Energy Council

2025 turbine-unit installations, mechanically installed capacity and OEM milestones.

Open source ↗
05
Global Wind Report 2026 launch overviewGlobal Wind Energy Council

Report scope, market themes and outlook period.

Open source ↗
06
Wind Energy Market ReportsU.S. Department of Energy

Official U.S. land-based, offshore and distributed wind report series.

Open source ↗
07
Wind Market Reports: 2024 EditionU.S. Department of Energy

Most recent edition available in DOE’s public report library during this review.

Open source ↗
08
Renewable electricity; production and capacityStatistics Netherlands (CBS)

Provisional 2025 Dutch wind capacity and electricity-production figures.

Open source ↗
09
Nieuwe windparken op zeeNetherlands Enterprise Agency (RVO)

Official offshore-wind roadmap, project status and expected commissioning windows.

Open source ↗
Definitions

Words that change the number.

Capacity data is only comparable when the underlying milestone matches.

Connected
Electrically linked to the power system; may or may not equal commercial-operation timing in every dataset.
Mechanically installed
Turbine erection is complete, but grid connection or commercial operation may follow later.
Under construction
Physical project delivery has begun under the source’s criteria; it is not yet operating capacity.
Pipeline
A collection of potential projects at multiple maturity levels. It should never be added to the operating fleet.
Forecast
An expected future outcome based on a stated methodology, not a project commitment.
See the definitions in practice →