Global capacity, annual additions, country coverage and the 2026–2030 outlook.
Open source ↗Show your work.
Our facts are designed to be checked. These are the current primary documents and the rules used to interpret them.
Five fields before a figure.
- 01Value
The number exactly as reported or transparently derived.
- 02Unit
GW, MW, turbine units, percentage or time period.
- 03Milestone
Operating, connected, mechanically installed, under construction, ready to build or forecast.
- 04Data period
The year or cutoff date the observation describes—not merely the report date.
- 05Source
The accountable publisher and a direct public link.
Primary sources used on this site.
Accessed July 19, 2026. We prefer publishers responsible for the dataset or report.
2025 installations, regional split and five-year market forecast.
Open source ↗Offshore operating capacity, construction pipeline and growth outlook.
Open source ↗2025 turbine-unit installations, mechanically installed capacity and OEM milestones.
Open source ↗Report scope, market themes and outlook period.
Open source ↗Official U.S. land-based, offshore and distributed wind report series.
Open source ↗Most recent edition available in DOE’s public report library during this review.
Open source ↗Provisional 2025 Dutch wind capacity and electricity-production figures.
Open source ↗Official offshore-wind roadmap, project status and expected commissioning windows.
Open source ↗Words that change the number.
Capacity data is only comparable when the underlying milestone matches.
- Connected
- Electrically linked to the power system; may or may not equal commercial-operation timing in every dataset.
- Mechanically installed
- Turbine erection is complete, but grid connection or commercial operation may follow later.
- Under construction
- Physical project delivery has begun under the source’s criteria; it is not yet operating capacity.
- Pipeline
- A collection of potential projects at multiple maturity levels. It should never be added to the operating fleet.
- Forecast
- An expected future outcome based on a stated methodology, not a project commitment.